14/04/2026
BEFORE YOU ENGAGE ANY PEST CONTROL PERSON MAKE SURE THEY ARE QUALIFIED/CERTIFIED BY BOTSWANA UNIVERSITY OF AGRICULTURE AND NATURAL RESOURCES (BUAN), AND IF ITS A COMPANY MAKE SURE IT'S LICENSED... IF YOU DON'T YOU ARE LIKELY RISKING PESTICIDE RESISTANCE. DEALING WITH PESTICIDE RESISTANCE CAN BE VERY EXPENSIVE πππ
PRE CONSTRUCTION TERMITES TREATMENT.
WE DO PRE-CONSTRUCTION TERMITES TREATMENT IN 2 PHASES
1st PHASE: FOOTING TRENCHES
2nd PHASE: AFTER LEVELING THE LAST TOPPING SOIL/GRAVEL (After compacting/leveling)
Termites do not crack the foundation of the structure to emerge.
Termites use available gaps and spaces to emerge. Normally a gap between the foundation slab and the foundation wall.
It is important that when treating the foundation soil, the chemical is applied in a manner that it lines along the foundation bricks. The anti Termites solution binds with the soil partiles along the foundation wall hence creating a red zone for termites tunnels that enters the foundation under footings.
With all this explained and shared, It is important to use the right chemicals applied by professional pest control technicians.
The video here shows our 1st and 2nd phases of Pre Construction Termites treatment, 2nd phase done a few days after doing 1st phase (treatment of footing trenches)
Contact us to assist you before experiencing damages that comes with huge costs
Contact: 72 744 080 (Whatsapp), 76203239
Email: [email protected]
Visit our office: Broadhurst Industrial,Lot 10041, Ground floor, office 4. Opposite Motovac.