01/09/2026
SMM 2026. Not every exhibit can be carried in with one hand. ⚓
Yesterday, we put one of the last pieces in place before SMM opens its doors: a heavy-lifting sling with an MBL of 2,000 tonnes.
Synthetic rope solutions are known for their low weight. But when you're operating in the maritime world, even fibre-based solutions can reach impressive dimensions.
With the help of our exhibition team and some careful coordination, the sling was lifted into place and is now ready for visitors.
The result is hanging above our stand, ready to be inspected up close.
From mooring and towing to cargo lashing and heavy lifting, we're looking forward to discussing the challenges shaping today's maritime industries.
Join us at SMM Hamburg from 1–4 September in Hall A1, Stand 428. Come, see and touch our solutions up close, including the 2,000-tonne MBL sling suspended above our stand.