04/27/2026
The Sewing Witch says, "We're getting there!"
Spring is here, (finally) the weather is warming up and it's time to get some work done in the garage. A couple hours here and there, depending on weather, schedules and body aches and pains are we now have the interior wall we built covered with OSB. Today John asked if I was busy. I'm always busy, but I can make time to work out there if he feels like doing it. We still have the ceiling to do and have decided to insulate the outside walls more before we are done. Still have two windows to install, trim work, painting, fitting room to build and the floor to seal. Progress is progress no matter how small. Now back to sewing!
As always, many blessings.
The Sewing Witch 🧙 🧵 🪡